A 2-year pilot study of groundwater irrigation was carried out in Ekxang to assess the technical performance, economic viability and effectiveness of the institutional arrangements.
A 2-year pilot study of groundwater irrigation was carried out in Ekxang to assess the technical performance, economic viability and effectiveness of the institutional arrangements.